QuikTrip #4163 Kitchen Expansion
๐Project Metrics
TDLR #TABS2022019679Project Closed
Project has been completed and closed
๐Scope of Work
Remodel to the FSC Kitchen and Sales Area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$500K total๐Related City Permits
Building permits found at or near this location
Repair and replace existing wooden deck(12 by 16ft) with composite deck in and extend by 7ft. The builder will install new concrete footings to meet Trex Specs 4x6 support post and attached to footings with metal post bases.Contractor to install double 2x10 beam and attached to 4x6 post. Contractor to install 2x8 ledger and bolted to home foundation with 1/2 wedge anchors every 24. Joist to be 2x8 at 16o.c. and attached to ledger with metal joist hangers and attach to beam the hurricane ties. All decking to be attached with camo hidden fasteners. Contractor to install a 4x4 landing with steps and 36 tall black metal railing with 5 1/2 IPE hand rail.
Replacement of an existing water heater 40 gallon propane water heater in the attic
New Service for Mobile Home in ETJ
Request to disconnect Installation of 200 AMP with 2 riser AE meter can and main panel upgrade with 2/0 CU x3 at 17 ft.
New Electrical Service for Quadplex in ETJ