TRANS4MATIVE
TRANS4MATIVE is a renovation/alteration project at 3050 POST OAK BLVD, SUITE 460, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2022). The project has an estimated value of $180K across about 3,210 sq ft.
๐Project Metrics
TDLR #TABS2022020649Project Closed
Project has been completed and closed
TRANS4MATIVE is a Renovation/Alteration project located at 3050 POST OAK BLVD, SUITE 460, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $180K covering 3,210 sq ft. SINOPEC USA is the property owner and ZIEGLER COOPER is the design firm of record. The project was registered with TDLR on June 3, 2022.
โFrequently Asked Questions
What is TRANS4MATIVE?
TRANS4MATIVE is a renovation/alteration project at 3050 POST OAK BLVD, SUITE 460 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: RENOVATION TO EXISTING SUITE
Is TRANS4MATIVE open in Houston?
Construction on TRANS4MATIVE is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2022. The building is finished and very likely open.
Where is TRANS4MATIVE located?
TRANS4MATIVE is located at 3050 POST OAK BLVD, SUITE 460, Houston, TX, 77056, in Harris County.
Who is the owner or developer of TRANS4MATIVE?
SINOPEC USA is the property owner/developer of record for TRANS4MATIVE, per its TDLR project registration.
Who is the architect or design firm for TRANS4MATIVE?
ZIEGLER COOPER is the design firm of record for TRANS4MATIVE, according to its TDLR filing.
How much does TRANS4MATIVE cost and how big is it?
TRANS4MATIVE has an estimated construction value of $180K and approximately 3,210 square feet (about $56/sqft), based on its TDLR filing.
๐Scope of Work
RENOVATION TO EXISTING SUITE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 3, 2022
Review Complete
Inspection Complete
Closed
Oct 3, 2022