Dishaka
Dishaka is a renovation/alteration project at 13843 Stafford Dr., Stafford, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2022). The project has an estimated value of $1.5M across about 44,940 sq ft.
๐Project Metrics
TDLR #TABS2022021504Project Closed
Project has been completed and closed
Dishaka is a Renovation/Alteration project located at 13843 Stafford Dr., Stafford, TX 77477 in Stafford, Texas. The project has an estimated value of $1.5M covering 44,940 sq ft. Dishaka, LLC is the property owner and Method Architecture is the design firm of record. The project was registered with TDLR on June 15, 2022.
โFrequently Asked Questions
What is Dishaka?
Dishaka is a renovation/alteration project at 13843 Stafford Dr. in Stafford, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The build-out of a new chip production line within the existing warehouse in an existing building
Is Dishaka open in Stafford?
Construction on Dishaka is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2022. The building is finished and very likely open.
Where is Dishaka located?
Dishaka is located at 13843 Stafford Dr., Stafford, TX, 77477, in Harris County.
Who is the owner or developer of Dishaka?
Dishaka, LLC is the property owner/developer of record for Dishaka, per its TDLR project registration.
Who is the architect or design firm for Dishaka?
Method Architecture is the design firm of record for Dishaka, according to its TDLR filing.
How much does Dishaka cost and how big is it?
Dishaka has an estimated construction value of $1.5M and approximately 44,940 square feet (about $33/sqft), based on its TDLR filing.
๐Scope of Work
The build-out of a new chip production line within the existing warehouse in an existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 15, 2022
Review Complete
Inspection Complete
Closed
Dec 31, 2022