โœ…Inspection Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

Texas Cheer New Facility

325 Ed Schmidt Boulevard, Hutto, TX 78634, Hutto, TX, 78634
Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #TABS2022022280
$600K
Project Value
16,310
Square Feet
$37/sqft
Cost/SqFt
6 months
Duration
Registered:Jun 24, 2022
Start:Jun 20, 2022
Target:Dec 12, 2022
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

๐Ÿ“‹Scope of Work

New two-level Gymnasium/Training Facility, with supporting offices, storage and restrooms, and new sitework

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
June 24, 2022
Inspection Complete
December 12, 2022
Construction Start
June 20, 2022
Expected Completion
December 12, 2022

๐Ÿ“Location & Views

Open in MapsGet Directions|30.54449, -97.56153

๐Ÿ“„Related City Permits

Building permits found at or near this location

325 W 6TH ST
22.00 mi away

THE GENERAL SCOPE OF THE PROJECT INCLUDES A ~17500 SF FIRST GENERATION BUILDOUT OF THE 20230 SF 12TH AND 14TH FLOOR SPACE OF AN EXISTING 57 FLOOR BUILDING. THIS INCLUDES BUT IS NOT LIMITED TO NEW WALLS DOOR CEILINGS CASEWORK LIGHTING AND MEP SYSTEMS.

ActiveElectrical PermitRemodelFeb 2026
View Details
2025-136138 EP
๐Ÿ”งEnterprise Electrical
325 W 6TH ST UNIT 1201
22.00 mi away

THE GENERAL SCOPE OF THE PROJECT INCLUDES A ~17500 SF FIRST GENERATION BUILDOUT OF THE 20230 SF 12TH AND 14TH FLOOR SPACE OF AN EXISTING 57 FLOOR BUILDING. THIS INCLUDES BUT IS NOT LIMITED TO NEW WALLS DOOR CEILINGS CASEWORK LIGHTING AND MEP SYSTEMS.

ActiveElectrical PermitRemodelFeb 2026
View Details
2025-136137 EP
๐Ÿ”งEnterprise Electrical
325 W 6TH ST
22.00 mi away

THE GENERAL SCOPE OF THE PROJECT INCLUDES A ~17500 SF FIRST GENERATION BUILDOUT OF THE 20230 SF 12TH AND 14TH FLOOR SPACE OF AN EXISTING 57 FLOOR BUILDING. THIS INCLUDES BUT IS NOT LIMITED TO NEW WALLS DOOR CEILINGS CASEWORK LIGHTING AND MEP SYSTEMS.

ActiveMechanical PermitRemodelFeb 2026
View Details
2025-136138 MP
๐Ÿ”งVista Air Services
325 W 6TH ST UNIT 1201
22.00 mi away

THE GENERAL SCOPE OF THE PROJECT INCLUDES A ~17500 SF FIRST GENERATION BUILDOUT OF THE 20230 SF 12TH AND 14TH FLOOR SPACE OF AN EXISTING 57 FLOOR BUILDING. THIS INCLUDES BUT IS NOT LIMITED TO NEW WALLS DOOR CEILINGS CASEWORK LIGHTING AND MEP SYSTEMS.

ActiveMechanical PermitRemodelFeb 2026
View Details
2025-136137 MP
๐Ÿ”งVista Air Services
325 MIDDLE GROUND CV
31.30 mi away

1 access hole in dirt 10 feet of tunnel to repair existing sewer line 2/6/26 LS Only inspected copper water line repair at garage floor. Concrete was removed and short tunnel excavated.

ActivePlumbing PermitRepairFeb 2026
View Details
2026-013089 PP
๐Ÿ”งBlackTie Plumbing

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists