Armor Brewing Co.
Armor Brewing Co. is a renovation/alteration project at 9 Prestige Cir., Allen, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2023). The project has an estimated value of $1.5M across about 10,445 sq ft.
๐Project Metrics
TDLR #TABS2022023044Project Closed
Project has been completed and closed
Armor Brewing Co. is a Renovation/Alteration project located at 9 Prestige Cir., Allen, TX 75002 in Allen, Texas. The project has an estimated value of $1.5M covering 10,445 sq ft. Michael Todryk is the property owner and Plan B Group, Inc. is the design firm of record. The project was registered with TDLR on July 6, 2022.
โFrequently Asked Questions
What is Armor Brewing Co.?
Armor Brewing Co. is a renovation/alteration project at 9 Prestige Cir. in Allen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition / Remodel of Existing Building
Is Armor Brewing Co. open in Allen?
Construction on Armor Brewing Co. is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2023. The building is finished and very likely open.
Where is Armor Brewing Co. located?
Armor Brewing Co. is located at 9 Prestige Cir., Allen, TX, 75002, in Collin County.
Who is the owner or developer of Armor Brewing Co.?
Michael Todryk is the property owner/developer of record for Armor Brewing Co., per its TDLR project registration.
Who is the architect or design firm for Armor Brewing Co.?
Plan B Group, Inc. is the design firm of record for Armor Brewing Co., according to its TDLR filing.
How much does Armor Brewing Co. cost and how big is it?
Armor Brewing Co. has an estimated construction value of $1.5M and approximately 10,445 square feet (about $144/sqft), based on its TDLR filing.
๐Scope of Work
Addition / Remodel of Existing Building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 6, 2022
Review Complete
Inspection Complete
Closed
Sep 1, 2023