Riverplace 1st Floor TI
๐Project Metrics
TDLR #TABS2022023472Review Complete
Design review complete, construction may proceed
๐Scope of Work
2379
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$495K total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work HVAC replacement like for like
(Reason George) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Installation of a 200A Service-Rated Automatic Transfer Switch 22kW whole home generator additional grounding and type 2 surge protection.
Tis is a commercial shopping center one of the strips has a transformer that feeds a 36 x36 jbox with tap blocks inside. there are 6 meter banks that have feeder from the tap blocks to each meter then there respective disconnects. One of the A phase has melted insulation due to overload or deterioation of the insulation. This is an emergency requuest due to if the bare phase touches any metal parts and arc fault explosion can take place the likelyhood is high. Please approve this request high priority. I will have to coordinate with Autin Energy to do after hrs. Time sensitive. High danger.
Install Level 2 EV Charger