TFC 20-21 DM HHSC Multiple Building Project - Phase 2
๐Project Metrics
TDLR #TABS2022025931Project Closed
Project has been completed and closed
๐Scope of Work
RDM-New fire hydrant + egress sidewalk INW-Roofing/site modifications to address flooding in NW corner JHW--Lower roof replacement, new walk-pad on roofs for maintaining equipment RBB--Brick faรงade repairs, new mow strip Other work in CDs
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Addition and Remodel The renovation of the entire existing house with two addtions at each end. A new workshop addition and the south end and a living dining kitchen and primary bedroom suite at the north end.
Interior Remodel for Existing Office - Suite 300
Interior Remodel for Existing Office - Suite 300
Interior Remodel for Existing Office - Suite 300
Re-route three romex wires and an outlet in a 53 long section of nonstructural interior wall that is being moved 5 inches. A 42(H) x 54(W) section of sheetrock will be removed exposing the entire lengths of the wires that need rerouting. The existing wall is a 42 high nonstructural half-height wall made of two 2x4 frames parallel to one another and separated by approximately one inch of space (13.5 thick overall including sheetrock). The intent of the project is to remove the outer 2x4 frame reducing the thickness of the wall to only one 2x4 structure. The wires are routed through the outer frame so they need to be re-routed through the inner frame.