LL Flooring
LL Flooring is a renovation/alteration project at 3300 W. Expressway 83, Space 197, Mcallen, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $300K across about 12,661 sq ft.
๐Project Metrics
TDLR #TABS2022026127Review Complete
Design review complete, construction may proceed
LL Flooring is a Renovation/Alteration project located at 3300 W. Expressway 83, Space 197, Mcallen, TX 78501 in Mcallen, Texas. The project has an estimated value of $300K covering 12,661 sq ft. Washington Prime Group is the property owner and Cortland Morgan Architect, AIA is the design firm of record. The project was registered with TDLR on August 15, 2022.
โFrequently Asked Questions
What is LL Flooring?
LL Flooring is a renovation/alteration project at 3300 W. Expressway 83, Space 197 in Mcallen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant fit-out.
Is LL Flooring open in Mcallen?
LL Flooring is currently under construction in Mcallen, TX. Its current TDLR status is "Review Complete".
Where is LL Flooring located?
LL Flooring is located at 3300 W. Expressway 83, Space 197, Mcallen, TX, 78501, in Hidalgo County.
Who is the owner or developer of LL Flooring?
Washington Prime Group is the property owner/developer of record for LL Flooring, per its TDLR project registration.
Who is the architect or design firm for LL Flooring?
Cortland Morgan Architect, AIA is the design firm of record for LL Flooring, according to its TDLR filing.
How much does LL Flooring cost and how big is it?
LL Flooring has an estimated construction value of $300K and approximately 12,661 square feet (about $24/sqft), based on its TDLR filing.
๐Scope of Work
Interior tenant fit-out.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 15, 2022
Review Complete
Aug 15, 2022
Inspection Complete
Closed