Morgan Stanley - West
Morgan Stanley - West is a renovation/alteration project at 8701 Bee Caves Rd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2023). The project has an estimated value of $3.0M across about 21,183 sq ft.
๐Project Metrics
TDLR #TABS2022026607Project Closed
Project has been completed and closed
Morgan Stanley - West is a Renovation/Alteration project located at 8701 Bee Caves Rd., Austin, TX 78746 in Austin, Texas. The project has an estimated value of $3.0M covering 21,183 sq ft. Riverside Resources is the property owner and HSB Architects & Engineers is the design firm of record. The project was registered with TDLR on August 19, 2022.
โFrequently Asked Questions
What is Morgan Stanley - West?
Morgan Stanley - West is a renovation/alteration project at 8701 Bee Caves Rd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: new 21,183sf interior office suite build-out in existing 3rd floor shell space.
Is Morgan Stanley - West open in Austin?
Construction on Morgan Stanley - West is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2023. The building is finished and very likely open.
Where is Morgan Stanley - West located?
Morgan Stanley - West is located at 8701 Bee Caves Rd., Austin, TX, 78746, in Travis County.
Who is the owner or developer of Morgan Stanley - West?
Riverside Resources is the property owner/developer of record for Morgan Stanley - West, per its TDLR project registration.
Who is the architect or design firm for Morgan Stanley - West?
HSB Architects & Engineers is the design firm of record for Morgan Stanley - West, according to its TDLR filing.
How much does Morgan Stanley - West cost and how big is it?
Morgan Stanley - West has an estimated construction value of $3.0M and approximately 21,183 square feet (about $142/sqft), based on its TDLR filing.
๐Scope of Work
new 21,183sf interior office suite build-out in existing 3rd floor shell space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 19, 2022
Review Complete
Inspection Complete
Closed
Mar 27, 2023
๐Related Projects
๐คSame Owner
$9.7M total๐๏ธSame Design Firm
$40.4M total๐Related City Permits
Building permits found at or near this location
12x25 Pool with autofill NG heater and ASTM F1346 Automatic safety cover.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System
Front yard residential irrigation system. 6 zone system including 3 dripper irrigation zones (2 for strips by road 1 for flower bed) and 3 mp rotator grass zones (2 side yard zones and 1 main front yard zone). Master valve isolation valve double check valve assembly rain sensor and rachio control box included in system. Trench depth to be 8 to 10 inches 6 inches of fill on top of pipes. Main line will horseshoe around the house so trenching will be done through the back yard for wiring and mainline. No back yard irrigation zones. 4 inch pop up heads used secured to class 200 3/4 inch lateral line pipe using swing pipe. Mainline to be 1 inch pipe. Purple primer and blue glue used for all connections.
MAIN ELECTRICAL SERVICE UPGRADE TO 200 AMPS
Replacement of an existing water heater WATER HEATER TANKLESS CHANGE-OUT