Wilbarger Creek Park Phase 2
๐Project Metrics
TDLR #TABS2022026806Project Closed
Project has been completed and closed
๐Scope of Work
New construction of approximately 118-space parking lot, 4,000 linear feet of concrete trail, and a pre-fabricated restroom facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
We are replacing a 100 amp disconnect on unit 78 in a fourplex after the meter on the exterior of the building. We would need the meter pulled and then reinstalled after the work is completed.
Replacement of an existing water heater Change Out: Replace 47 gallon tank-type electric water heater w/ 40 gallon tank-type electric water heater
Install new 13.50 kW DC rooftop solar system to existing residential
Construction of a 2257 square foot Commercial Swimming Pool
ePlan: Expedited Review - New Construction of a 1-Story Pavilion Bldg (360 SF)