DFW Terminal C Garage and Roadways Phase 2
DFW Terminal C Garage and Roadways Phase 2 is a renovation/alteration project at 2330 North International Parkway, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $53.4M across about 656,992 sq ft.
๐Project Metrics
TDLR #TABS2022026991Review Complete
Design review complete, construction may proceed
DFW Terminal C Garage and Roadways Phase 2 is a Renovation/Alteration project located at 2330 North International Parkway, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $53.4M covering 656,992 sq ft. DFW Airport is the property owner and HOK is the design firm of record. The project was registered with TDLR on August 24, 2022.
โFrequently Asked Questions
What is DFW Terminal C Garage and Roadways Phase 2?
DFW Terminal C Garage and Roadways Phase 2 is a renovation/alteration project at 2330 North International Parkway in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of an existing five story parking garage.
Is DFW Terminal C Garage and Roadways Phase 2 open in Dfw Airport?
DFW Terminal C Garage and Roadways Phase 2 is currently under construction in Dfw Airport, TX. Its current TDLR status is "Review Complete".
Where is DFW Terminal C Garage and Roadways Phase 2 located?
DFW Terminal C Garage and Roadways Phase 2 is located at 2330 North International Parkway, Dfw Airport, TX, 75261, in Tarrant County.
Who is the owner or developer of DFW Terminal C Garage and Roadways Phase 2?
DFW Airport is the property owner/developer of record for DFW Terminal C Garage and Roadways Phase 2, per its TDLR project registration.
Who is the architect or design firm for DFW Terminal C Garage and Roadways Phase 2?
HOK is the design firm of record for DFW Terminal C Garage and Roadways Phase 2, according to its TDLR filing.
How much does DFW Terminal C Garage and Roadways Phase 2 cost and how big is it?
DFW Terminal C Garage and Roadways Phase 2 has an estimated construction value of $53.4M and approximately 656,992 square feet (about $81/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of an existing five story parking garage.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 24, 2022
Review Complete
Aug 24, 2022
Inspection Complete
Closed