DFW Terminal C Garage and Roadways Phase 3
DFW Terminal C Garage and Roadways Phase 3 is a renovation/alteration project at 2330 North International Parkway, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $55.2M across about 650,351 sq ft.
๐Project Metrics
TDLR #TABS2022026995Review Complete
Design review complete, construction may proceed
DFW Terminal C Garage and Roadways Phase 3 is a Renovation/Alteration project located at 2330 North International Parkway, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $55.2M covering 650,351 sq ft. DFW Airport is the property owner and HOK is the design firm of record. The project was registered with TDLR on August 24, 2022.
โFrequently Asked Questions
What is DFW Terminal C Garage and Roadways Phase 3?
DFW Terminal C Garage and Roadways Phase 3 is a renovation/alteration project at 2330 North International Parkway in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of an existing five story parking garage.
Is DFW Terminal C Garage and Roadways Phase 3 open in Dfw Airport?
DFW Terminal C Garage and Roadways Phase 3 is still under construction in Dfw Airport, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is DFW Terminal C Garage and Roadways Phase 3 located?
DFW Terminal C Garage and Roadways Phase 3 is located at 2330 North International Parkway, Dfw Airport, TX, 75261, in Tarrant County.
Who is the owner or developer of DFW Terminal C Garage and Roadways Phase 3?
DFW Airport is the property owner/developer of record for DFW Terminal C Garage and Roadways Phase 3, per its TDLR project registration.
Who is the architect or design firm for DFW Terminal C Garage and Roadways Phase 3?
HOK is the design firm of record for DFW Terminal C Garage and Roadways Phase 3, according to its TDLR filing.
How much does DFW Terminal C Garage and Roadways Phase 3 cost and how big is it?
DFW Terminal C Garage and Roadways Phase 3 has an estimated construction value of $55.2M and approximately 650,351 square feet (about $85/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of an existing five story parking garage.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 24, 2022
Review Complete
Aug 24, 2022
Inspection Complete
Closed