Spec. Suite 700-A
Spec. Suite 700-A is a renovation/alteration project at 1155 Dairy Ashford, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $115K across about 2,978 sq ft.
๐Project Metrics
TDLR #TABS2023000346Review Complete
Design review complete, construction may proceed
Spec. Suite 700-A is a Renovation/Alteration project located at 1155 Dairy Ashford, Houston, TX 77079 in Houston, Texas. The project has an estimated value of $115K covering 2,978 sq ft. BRI 1851 Ashford LLC is the property owner and Q Studio Group is the design firm of record. The project was registered with TDLR on September 7, 2022.
โFrequently Asked Questions
What is Spec. Suite 700-A?
Spec. Suite 700-A is a renovation/alteration project at 1155 Dairy Ashford in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation/alteration work to an existing lease space.
Is Spec. Suite 700-A open in Houston?
Spec. Suite 700-A is currently under construction in Houston, TX. Its current TDLR status is "Review Complete".
Where is Spec. Suite 700-A located?
Spec. Suite 700-A is located at 1155 Dairy Ashford, Houston, TX, 77079, in Harris County.
Who is the owner or developer of Spec. Suite 700-A?
BRI 1851 Ashford LLC is the property owner/developer of record for Spec. Suite 700-A, per its TDLR project registration.
Who is the architect or design firm for Spec. Suite 700-A?
Q Studio Group is the design firm of record for Spec. Suite 700-A, according to its TDLR filing.
How much does Spec. Suite 700-A cost and how big is it?
Spec. Suite 700-A has an estimated construction value of $115K and approximately 2,978 square feet (about $38/sqft), based on its TDLR filing.
๐Scope of Work
Renovation/alteration work to an existing lease space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 7, 2022
Review Complete
Sep 7, 2022
Inspection Complete
Closed