Nail Time Bar is a renovation/alteration project at 4909 Gattis School Road 4909 Gattis School Road, Hutto, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $400K across about 3,000 sq ft.
Design review complete, construction may proceed
Nail Time Bar is a Renovation/Alteration project located at 4909 Gattis School Road 4909 Gattis School Road, Hutto, TX 78634 in Hutto, Texas. The project has an estimated value of $400K covering 3,000 sq ft. Muirfield Crossing LLC is the property owner. The project was registered with TDLR on September 13, 2022.
Nail Time Bar is a renovation/alteration project at 4909 Gattis School Road 4909 Gattis School Road in Hutto, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior tenant finish out
Nail Time Bar is currently under construction in Hutto, TX. Its current TDLR status is "Review Complete".
Nail Time Bar is located at 4909 Gattis School Road 4909 Gattis School Road, Hutto, TX, 78634, in Williamson County.
Muirfield Crossing LLC is the property owner/developer of record for Nail Time Bar, per its TDLR project registration.
Nail Time Bar has an estimated construction value of $400K and approximately 3,000 square feet (about $133/sqft), based on its TDLR filing.
interior tenant finish out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 13, 2022
Review Complete
Sep 13, 2022
Inspection Complete
Closed
Building permits found at or near this location
Construct new driveway approach of 16.3 FT and sidewalk of 33.9 LF
Building 1 New Deck and Stoops for existing SFR Relocate Main house to front of Lot (within the property lines) 3/2 (no interior repair work other than reconnections) the relocation will be treated as New Construction for permitting purposes. Description of Revision: Adding minor framing adjustments to the interior of building 1: Deleting bedroom 3 and incorporating into living space. Relocating bathroom 2. Replacing 19 existing windows. All same size/location. No change in footprint. No change to bathroom count. Revised pages are incorporated into previously approved plan set. Please see pgs 7-13 for proposed revisions.
Building 1 New Deck and Stoops for existing SFR Relocate Main house to front of Lot (within the property lines) 3/2 (no interior repair work other than reconnections) the relocation will be treated as New Construction for permitting purposes. Description of Revision: Adding minor framing adjustments to the interior of building 1: Deleting bedroom 3 and incorporating into living space. Relocating bathroom 2. Replacing 19 existing windows. All same size/location. No change in footprint. No change to bathroom count. Revised pages are incorporated into previously approved plan set. Please see pgs 7-13 for proposed revisions.
Building 1 New Deck and Stoops for existing SFR Relocate Main house to front of Lot (within the property lines) 3/2 (no interior repair work other than reconnections) the relocation will be treated as New Construction for permitting purposes. Description of Revision: Adding minor framing adjustments to the interior of building 1: Deleting bedroom 3 and incorporating into living space. Relocating bathroom 2. Replacing 19 existing windows. All same size/location. No change in footprint. No change to bathroom count. Revised pages are incorporated into previously approved plan set. Please see pgs 7-13 for proposed revisions.
Building 3 New 3 Story SFR 3/2.5