Final inspection completed, awaiting project closure
Simsboro Aquifer Water Treatment Plan is a New Construction project located at 265 Sayers Road, Bastrop, TX 78602 in Bastrop, Texas. The project has an estimated value of $6.8M covering 14,435 sq ft. City of Bastrop is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on September 14, 2022.
Simsboro Aquifer Water Treatment Plant - Chemical and filter facilities building with four (4) filters, storage room, break room, office, lab space, chlorine storage, a maintenance shop, electrical rooms and caustic and zine ortho-P rooms.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 14, 2022
Review Complete
Inspection Complete
Sep 30, 2024
Closed
Building permits found at or near this location
Rooftop Solar System Installation
Rooftop Solar System Installation
Upgrade requested as we will now need to replace the electric meter. (Associated with AUX permit # 2023-139531 EP)
Install 20 (405W) roof mounted solar panels 8.100 kW solar service system tying into new 200 AMP rated Tesla Gateway 2 with 1 Tesla Powerwall 2
Express- Existing foundation repair as per scope of work attached
Businesses at and near this location
Business data from Google
Need a contractor for this project?
Browse verified general contractors active in Bastrop County
Find General Contractors in Bastrop