TESO LIFE
TESO LIFE is a new construction project at 9150 WARREN PKWY, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2023). The project has an estimated value of $250K across about 10,424 sq ft.
๐Project Metrics
TDLR #TABS2023001372Project Closed
Project has been completed and closed
TESO LIFE is a New Construction project located at 9150 WARREN PKWY, Frisco, TX 75035 in Frisco, Texas. The project has an estimated value of $250K covering 10,424 sq ft. A-S 137 FRISCO RANCH LP is the property owner and BC STRUCTURAL ENGINEERS LLC is the design firm of record. The project was registered with TDLR on September 20, 2022.
โFrequently Asked Questions
What is TESO LIFE?
TESO LIFE is a new construction project at 9150 WARREN PKWY in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: RETAIL STORE
Is TESO LIFE open in Frisco?
Construction on TESO LIFE is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2023. The building is finished and very likely open.
Where is TESO LIFE located?
TESO LIFE is located at 9150 WARREN PKWY, Frisco, TX, 75035, in Collin County.
Who is the owner or developer of TESO LIFE?
A-S 137 FRISCO RANCH LP is the property owner/developer of record for TESO LIFE, per its TDLR project registration.
Who is the architect or design firm for TESO LIFE?
BC STRUCTURAL ENGINEERS LLC is the design firm of record for TESO LIFE, according to its TDLR filing.
How much does TESO LIFE cost and how big is it?
TESO LIFE has an estimated construction value of $250K and approximately 10,424 square feet (about $24/sqft), based on its TDLR filing.
๐Scope of Work
RETAIL STORE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 20, 2022
Review Complete
Inspection Complete
Closed
Jun 30, 2023
๐Related Projects
๐คSame Owner
$7.8M total๐๏ธSame Design Firm
$14.1M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Tenant
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Collin County
Find General Contractors in Collin