Dawn to Dusk Cafe
Dawn to Dusk Cafe is a renovation/alteration project at 6561 Riverside Dr, Ste 101, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $125K across about 2,250 sq ft.
๐Project Metrics
TDLR #TABS2023002339Project Registered
Project has been registered with TDLR and is in pre-construction phase
Dawn to Dusk Cafe is a Renovation/Alteration project located at 6561 Riverside Dr, Ste 101, Irving, TX 75039 in Irving, Texas. The project has an estimated value of $125K covering 2,250 sq ft. ISWIM ACADEMY LLC is the property owner and Dallas Design Build is the design firm of record. The project was registered with TDLR on October 4, 2022.
โFrequently Asked Questions
What is Dawn to Dusk Cafe?
Dawn to Dusk Cafe is a renovation/alteration project at 6561 Riverside Dr, Ste 101 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Cafe (Coffee and breakfast/ brunch place)
Is Dawn to Dusk Cafe open in Irving?
Dawn to Dusk Cafe is currently under construction in Irving, TX. Its current TDLR status is "Project Registered".
Where is Dawn to Dusk Cafe located?
Dawn to Dusk Cafe is located at 6561 Riverside Dr, Ste 101, Irving, TX, 75039, in Dallas County.
Who is the owner or developer of Dawn to Dusk Cafe?
ISWIM ACADEMY LLC is the property owner/developer of record for Dawn to Dusk Cafe, per its TDLR project registration.
Who is the architect or design firm for Dawn to Dusk Cafe?
Dallas Design Build is the design firm of record for Dawn to Dusk Cafe, according to its TDLR filing.
How much does Dawn to Dusk Cafe cost and how big is it?
Dawn to Dusk Cafe has an estimated construction value of $125K and approximately 2,250 square feet (about $56/sqft), based on its TDLR filing.
๐Scope of Work
Cafe (Coffee and breakfast/ brunch place)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 4, 2022
Review Complete
Inspection Complete
Closed