Engineered Fluids
Engineered Fluids is a renovation/alteration project at 4917 Profit Drive, Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $370K across about 3,750 sq ft.
๐Project Metrics
TDLR #TABS2023002502Project Registered
Project has been registered with TDLR and is in pre-construction phase
Engineered Fluids is a Renovation/Alteration project located at 4917 Profit Drive, Tyler, TX 75707 in Tyler, Texas. The project has an estimated value of $370K covering 3,750 sq ft. David Sundin is the property owner. The project was registered with TDLR on October 5, 2022.
โFrequently Asked Questions
What is Engineered Fluids?
Engineered Fluids is a renovation/alteration project at 4917 Profit Drive in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CONVERSION OF EXISTING METAL BUILDING INTO OFFICE SPACE, LABORATORY AND PREP. ROOM
Is Engineered Fluids open in Tyler?
Engineered Fluids is currently under construction in Tyler, TX. Its current TDLR status is "Project Registered".
Where is Engineered Fluids located?
Engineered Fluids is located at 4917 Profit Drive, Tyler, TX, 75707, in Smith County.
Who is the owner or developer of Engineered Fluids?
David Sundin is the property owner/developer of record for Engineered Fluids, per its TDLR project registration.
How much does Engineered Fluids cost and how big is it?
Engineered Fluids has an estimated construction value of $370K and approximately 3,750 square feet (about $99/sqft), based on its TDLR filing.
๐Scope of Work
CONVERSION OF EXISTING METAL BUILDING INTO OFFICE SPACE, LABORATORY AND PREP. ROOM
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 5, 2022
Review Complete
Inspection Complete
Closed