Duncan Neighborhood Park General Park Improvements
Duncan Neighborhood Park General Park Improvements is a renovation/alteration project at 900 W. 9th St., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2024). The project has an estimated value of $1.3M across about 174,240 sq ft.
๐Project Metrics
TDLR #TABS2023004397Inspection Complete
Final inspection completed, awaiting project closure
Duncan Neighborhood Park General Park Improvements is a Renovation/Alteration project located at 900 W. 9th St., Austin, TX 78701 in Austin, Texas. The project has an estimated value of $1.3M covering 174,240 sq ft. City of Austin Parks and Recreation Dept. is the property owner and Dunaway Engineering is the design firm of record. The project was registered with TDLR on November 1, 2022.
โFrequently Asked Questions
What is Duncan Neighborhood Park General Park Improvements?
Duncan Neighborhood Park General Park Improvements is a renovation/alteration project at 900 W. 9th St. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New walkways connecting to existing walkways, pedestrian plazas with picnic tables and new park steps. Pedestrian boardwalk over wetland and smaller boardwalk over drainage swale, new park walkway connection to existing Shoal Creek trail...
Is Duncan Neighborhood Park General Park Improvements open in Austin?
Construction on Duncan Neighborhood Park General Park Improvements is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2024. The building is finished and very likely open.
Where is Duncan Neighborhood Park General Park Improvements located?
Duncan Neighborhood Park General Park Improvements is located at 900 W. 9th St., Austin, TX, 78701, in Travis County.
Who is the owner or developer of Duncan Neighborhood Park General Park Improvements?
City of Austin Parks and Recreation Dept. is the property owner/developer of record for Duncan Neighborhood Park General Park Improvements, per its TDLR project registration.
Who is the architect or design firm for Duncan Neighborhood Park General Park Improvements?
Dunaway Engineering is the design firm of record for Duncan Neighborhood Park General Park Improvements, according to its TDLR filing.
How much does Duncan Neighborhood Park General Park Improvements cost and how big is it?
Duncan Neighborhood Park General Park Improvements has an estimated construction value of $1.3M and approximately 174,240 square feet (about $7/sqft), based on its TDLR filing.
๐Scope of Work
New walkways connecting to existing walkways, pedestrian plazas with picnic tables and new park steps. Pedestrian boardwalk over wetland and smaller boardwalk over drainage swale, new park walkway connection to existing Shoal Creek trail...
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 1, 2022
Review Complete
Inspection Complete
Feb 1, 2024
Closed
๐Related Projects
๐คSame Owner
$3.67B total๐๏ธSame Design Firm
$191.1M total๐Related City Permits
Building permits found at or near this location
Install 25.08 kW DC Solar
TPOLE REF BP # 2026-083167
New 1-story single family residence 4 bed/3.5 bath with attached garage covered porch and covered patio Green building
New 1-story single family residence 4 bed/3.5 bath with attached garage covered porch and covered patio Green building
New 1-story single family residence 4 bed/3.5 bath with attached garage covered porch and covered patio Green building