Final inspection completed, awaiting project closure
Duncan Neighborhood Park General Park Improvements is a Renovation/Alteration project located at 900 W. 9th St., Austin, TX 78701 in Austin, Texas. The project has an estimated value of $1.3M covering 174,240 sq ft. City of Austin Parks and Recreation Dept. is the property owner and Dunaway Engineering is the design firm of record. The project was registered with TDLR on November 1, 2022.
New walkways connecting to existing walkways, pedestrian plazas with picnic tables and new park steps. Pedestrian boardwalk over wetland and smaller boardwalk over drainage swale, new park walkway connection to existing Shoal Creek trail...
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 1, 2022
Review Complete
Inspection Complete
Feb 1, 2024
Closed
Building permits found at or near this location
Install Level 2 EV Charger
2026/04/11 | (2026/04/10 - 2026/04/12) | Earth Day ATX led by Earth Day Austin takes place on the Huston-Tillotson Campus from 12 to 5 PM on Saturday April 11th. It is open to the public and has no cost. Earth Day ATX is an annual public environmental education and community engagement event held in Austin Texas. The festival is designed to provide a platform for sustainability-focused businesses nonprofit organizations advocacy groups public agencies and community leaders to engage attendees through exhibits interactive activities educational programming music and food service. The eventยฟs purpose is to promote conservation sustainable practices innovation and environmental justice in an inclusive family-friendly setting.
New Construction of Pool House with restrooms and pool equipment. Swimming Pool has been permitted separately. Site Plan C7 included with this SUbmittal TDLR included with the Hotel BILL TO 5765333
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 Ton Vertical Heat Pump System
Replacement of an existing water heater we will be changing out the tank style gas water heater for a similar model