Holford Road Reconstruction Segment A from P.G.B.T. to City Limits is a renovation/alteration project at Holford Road, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $1.3M across about 575,000 sq ft.
Final inspection completed, awaiting project closure
Holford Road Reconstruction Segment A from P.G.B.T. to City Limits is a Renovation/Alteration project located at Holford Road, Garland, TX 75044 in Garland, Texas. The project has an estimated value of $1.3M covering 575,000 sq ft. City of Garland is the property owner and R-Delta Engineers, Inc. is the design firm of record. The project was registered with TDLR on November 17, 2022.
Holford Road Reconstruction Segment A from P.G.B.T. to City Limits is a renovation/alteration project at Holford Road in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of approx. 26,400 square yards of concrete paving, 8,500 square yards of shared use path with storm drainage, water lines, retaining walls and related items.
Construction on Holford Road Reconstruction Segment A from P.G.B.T. to City Limits is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Holford Road Reconstruction Segment A from P.G.B.T. to City Limits is located at Holford Road, Garland, TX, 75044, in Dallas County.
City of Garland is the property owner/developer of record for Holford Road Reconstruction Segment A from P.G.B.T. to City Limits, per its TDLR project registration.
R-Delta Engineers, Inc. is the design firm of record for Holford Road Reconstruction Segment A from P.G.B.T. to City Limits, according to its TDLR filing.
Holford Road Reconstruction Segment A from P.G.B.T. to City Limits has an estimated construction value of $1.3M and approximately 575,000 square feet (about $2/sqft), based on its TDLR filing.
Construction of approx. 26,400 square yards of concrete paving, 8,500 square yards of shared use path with storm drainage, water lines, retaining walls and related items.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 17, 2022
Review Complete
Nov 17, 2022
Inspection Complete
Jan 28, 2026
Closed
1168d
Construction phase