Turner Park Phase 1 Improvements
Turner Park Phase 1 Improvements is a new construction project at 600 Beltline Rd., Grand Prairie, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2023). The project has an estimated value of $1.8M across about 130,500 sq ft.
๐Project Metrics
TDLR #TABS2023005982Project Closed
Project has been completed and closed
Turner Park Phase 1 Improvements is a New Construction project located at 600 Beltline Rd., Grand Prairie, TX 75050 in Grand Prairie, Texas. The project has an estimated value of $1.8M covering 130,500 sq ft. Grand Prairie Park, Arts and Recreation Department Attn: Steve Plumer is the property owner and Dunaway Associates is the design firm of record. The project was registered with TDLR on November 22, 2022.
โFrequently Asked Questions
What is Turner Park Phase 1 Improvements?
Turner Park Phase 1 Improvements is a new construction project at 600 Beltline Rd. in Grand Prairie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 8 ft wide concrete trl loop, parking, entry gateway, prefab pavilion, playground comp., poured in place safety surfacing, 2 prefab shade struct., 1 prefab RR w/ water&sewer, prefab pavilion at baseball tribute area, site furniture, lndscโฆ
Is Turner Park Phase 1 Improvements open in Grand Prairie?
Construction on Turner Park Phase 1 Improvements is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2023. The building is finished and very likely open.
Where is Turner Park Phase 1 Improvements located?
Turner Park Phase 1 Improvements is located at 600 Beltline Rd., Grand Prairie, TX, 75050, in Dallas County.
Who is the owner or developer of Turner Park Phase 1 Improvements?
Grand Prairie Park, Arts and Recreation Department Attn: Steve Plumer is the property owner/developer of record for Turner Park Phase 1 Improvements, per its TDLR project registration.
Who is the architect or design firm for Turner Park Phase 1 Improvements?
Dunaway Associates is the design firm of record for Turner Park Phase 1 Improvements, according to its TDLR filing.
How much does Turner Park Phase 1 Improvements cost and how big is it?
Turner Park Phase 1 Improvements has an estimated construction value of $1.8M and approximately 130,500 square feet (about $14/sqft), based on its TDLR filing.
๐Scope of Work
8 ft wide concrete trl loop, parking, entry gateway, prefab pavilion, playground comp., poured in place safety surfacing, 2 prefab shade struct., 1 prefab RR w/ water&sewer, prefab pavilion at baseball tribute area, site furniture, lndscp&irrgation.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 22, 2022
Review Complete
Inspection Complete
Closed
Oct 31, 2023
๐Related Projects
Property Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Dallas County
Find General Contractors in Dallas