Valvoline Instant Oil Change
Valvoline Instant Oil Change is a new construction project at 5100 S FM 1626, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $1.4M across about 2,080 sq ft.
๐Project Metrics
TDLR #TABS2023006278Project Closed
Project has been completed and closed
Valvoline Instant Oil Change is a New Construction project located at 5100 S FM 1626, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $1.4M covering 2,080 sq ft. Valvoline is the property owner and Harrison French & Associates is the design firm of record. The project was registered with TDLR on November 29, 2022.
โFrequently Asked Questions
What is Valvoline Instant Oil Change?
Valvoline Instant Oil Change is a new construction project at 5100 S FM 1626 in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Construction Valvoline Instant Oil Change
Is Valvoline Instant Oil Change open in Kyle?
Construction on Valvoline Instant Oil Change is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
Where is Valvoline Instant Oil Change located?
Valvoline Instant Oil Change is located at 5100 S FM 1626, Kyle, TX, 78640, in Hays County.
Who is the owner or developer of Valvoline Instant Oil Change?
Valvoline is the property owner/developer of record for Valvoline Instant Oil Change, per its TDLR project registration.
Who is the architect or design firm for Valvoline Instant Oil Change?
Harrison French & Associates is the design firm of record for Valvoline Instant Oil Change, according to its TDLR filing.
How much does Valvoline Instant Oil Change cost and how big is it?
Valvoline Instant Oil Change has an estimated construction value of $1.4M and approximately 2,080 square feet (about $697/sqft), based on its TDLR filing.
๐Scope of Work
New Construction Valvoline Instant Oil Change
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 29, 2022
Review Complete
Inspection Complete
Closed
Dec 1, 2023
๐Related Projects
๐คSame Owner
$36.3M total๐Related City Permits
Building permits found at or near this location
Placement of portable with associated access stair and ramp. Location of portable will be the same as previously permitted in 2014. MEP connections are made to stubs left from the previously permitted effort (2014-044647 PR / 2014-025211 DA.) - OVA (Building 6)
Placement of portable with associated access stair and ramp. Location of portable will be the same as previously permitted in 2014. MEP connections are made to stubs left from the previously permitted effort (2014-044647 PR / 2014-025211 DA.) - OVA (Building 5)
irrigation for lawn
Caprock S405 B Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Caprock S405 B Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Property Owner
Design Firm
Registered Accessibility Specialist
Hays County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Hays County
Find General Contractors in Hays