Project has been completed and closed
Mabank ISD JH Locker Room Renovation is a Renovation/Alteration project located at 822 W. Mason Street, Mabank, TX 75147 in Mabank, Texas. The project has an estimated value of $1.0M covering 14,766 sq ft. Mabank Independent School District is the property owner and Claycomb Associates Architects is the design firm of record. The project was registered with TDLR on December 15, 2022.
Mabank ISD JH Locker Room Renovation is a renovation/alteration project at 822 W. Mason Street, Mabank, TX 75147 in Mabank, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing locker rooms.
Construction on Mabank ISD JH Locker Room Renovation is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.
Mabank ISD JH Locker Room Renovation is located at 822 W. Mason Street, Mabank, TX 75147, Mabank, TX, 75147, in Kaufman County.
Mabank Independent School District is the property owner/developer of record for Mabank ISD JH Locker Room Renovation, per its TDLR project registration.
Claycomb Associates Architects is the design firm of record for Mabank ISD JH Locker Room Renovation, according to its TDLR filing.
Mabank ISD JH Locker Room Renovation has an estimated construction value of $1.0M and approximately 14,766 square feet (about $68/sqft), based on its TDLR filing.
Renovation of existing locker rooms.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 15, 2022
Review Complete
Inspection Complete
Closed
Aug 31, 2023