Interior Fit-up for SSMT
Interior Fit-up for SSMT is a renovation/alteration project at 4101 E Plano Pkwy, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2023). The project has an estimated value of $8.0M across about 136,210 sq ft.
๐Project Metrics
TDLR #TABS2023007782Project Closed
Project has been completed and closed
Interior Fit-up for SSMT is a Renovation/Alteration project located at 4101 E Plano Pkwy, Plano, TX 75074 in Plano, Texas. The project has an estimated value of $8.0M covering 136,210 sq ft. Trident Capital Group is the property owner and Archiplan Design Group,Inc is the design firm of record. The project was registered with TDLR on December 17, 2022.
โFrequently Asked Questions
What is Interior Fit-up for SSMT?
Interior Fit-up for SSMT is a renovation/alteration project at 4101 E Plano Pkwy in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Fit-up of Offices and Production areas
Is Interior Fit-up for SSMT open in Plano?
Construction on Interior Fit-up for SSMT is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2023. The building is finished and very likely open.
Where is Interior Fit-up for SSMT located?
Interior Fit-up for SSMT is located at 4101 E Plano Pkwy, Plano, TX, 75074, in Collin County.
Who is the owner or developer of Interior Fit-up for SSMT?
Trident Capital Group is the property owner/developer of record for Interior Fit-up for SSMT, per its TDLR project registration.
Who is the architect or design firm for Interior Fit-up for SSMT?
Archiplan Design Group,Inc is the design firm of record for Interior Fit-up for SSMT, according to its TDLR filing.
How much does Interior Fit-up for SSMT cost and how big is it?
Interior Fit-up for SSMT has an estimated construction value of $8.0M and approximately 136,210 square feet (about $59/sqft), based on its TDLR filing.
๐Scope of Work
Interior Fit-up of Offices and Production areas
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 17, 2022
Review Complete
Inspection Complete
Closed
Apr 30, 2023