Salerno Phase 8
๐Project Metrics
TDLR #TABS2023007960Project Closed
Project has been completed and closed
๐Scope of Work
Subdivision Construction of Streets with ADA ramps and portions of sidewalk constructed in common areas not fronting single family lots.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Interior Remodel Interior remodel of 1st floor kitchen and mudroom 2nd floor primary bedroom bath and home office addition of sliding door on 2nd floor covered terrace
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 ton vertical gas system (lower level) LIKE FOR LIKE: 4 ton vertical gas system (middle level) LIKE FOR LIKE: 2 ton horizontal gas system (upstairs)
New single-story mobile home 3 bedrooms and 2 bathrooms. new driveway and sidewalk
New single-story mobile home 3 bedrooms and 2 bathrooms. new driveway and sidewalk
New single-story mobile home 3 bedrooms and 2 bathrooms. new driveway and sidewalk