BONG TRADING INC
BONG TRADING INC is a renovation/alteration project at 10165 HARWIN DRIVE STE 150, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2023). The project has an estimated value of $359K across about 8,414 sq ft.
๐Project Metrics
TDLR #TABS2023008743Project Closed
Project has been completed and closed
BONG TRADING INC is a Renovation/Alteration project located at 10165 HARWIN DRIVE STE 150, Houston, TX 77036 in Houston, Texas. The project has an estimated value of $359K covering 8,414 sq ft. PHP PWBC VENTURE LP is the property owner. The project was registered with TDLR on January 5, 2023.
โFrequently Asked Questions
What is BONG TRADING INC?
BONG TRADING INC is a renovation/alteration project at 10165 HARWIN DRIVE STE 150 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: RENOVATION OF SPACE TO SPLIT INTO 3 SEPARATE SUITES
Is BONG TRADING INC open in Houston?
Construction on BONG TRADING INC is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2023. The building is finished and very likely open.
Where is BONG TRADING INC located?
BONG TRADING INC is located at 10165 HARWIN DRIVE STE 150, Houston, TX, 77036, in Harris County.
Who is the owner or developer of BONG TRADING INC?
PHP PWBC VENTURE LP is the property owner/developer of record for BONG TRADING INC, per its TDLR project registration.
How much does BONG TRADING INC cost and how big is it?
BONG TRADING INC has an estimated construction value of $359K and approximately 8,414 square feet (about $43/sqft), based on its TDLR filing.
๐Scope of Work
RENOVATION OF SPACE TO SPLIT INTO 3 SEPARATE SUITES
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 5, 2023
Review Complete
Inspection Complete
Closed
Jun 12, 2023