Crocs Tanger
Crocs Tanger is a renovation/alteration project at 4015 S Interstate 35, Suite 610, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2023). The project has an estimated value of $138K across about 2,853 sq ft.
๐Project Metrics
TDLR #TABS2023009725Project Closed
Project has been completed and closed
Crocs Tanger is a Renovation/Alteration project located at 4015 S Interstate 35, Suite 610, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $138K covering 2,853 sq ft. Tanger Factory Outlet Centers, Inc. is the property owner and BKA Architects is the design firm of record. The project was registered with TDLR on January 19, 2023.
โFrequently Asked Questions
What is Crocs Tanger?
Crocs Tanger is a renovation/alteration project at 4015 S Interstate 35, Suite 610 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant fit up including new partitions, lighting, electrical, plumbing, mechanical, merchandising and finishes.
Is Crocs Tanger open in San Marcos?
Construction on Crocs Tanger is complete โ TDLR records show the project passed its required accessibility inspection in May 2023. The building is finished and very likely open.
Where is Crocs Tanger located?
Crocs Tanger is located at 4015 S Interstate 35, Suite 610, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of Crocs Tanger?
Tanger Factory Outlet Centers, Inc. is the property owner/developer of record for Crocs Tanger, per its TDLR project registration.
Who is the architect or design firm for Crocs Tanger?
BKA Architects is the design firm of record for Crocs Tanger, according to its TDLR filing.
How much does Crocs Tanger cost and how big is it?
Crocs Tanger has an estimated construction value of $138K and approximately 2,853 square feet (about $48/sqft), based on its TDLR filing.
๐Scope of Work
Interior tenant fit up including new partitions, lighting, electrical, plumbing, mechanical, merchandising and finishes.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 19, 2023
Review Complete
Inspection Complete
Closed
May 31, 2023
๐Related Projects
๐คSame Owner
$5.6M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Heat Pump System
Express: replace 17 windows
Expedited Review - New Construction of a 2-Story Secondary Apartment [2bed 2bath]
Expedited Review - New Construction of a 2-Story Single Family Res. [3bed 3.5bath] with Habitable Attic and attached 1-car Garage
New pool