Altamira Phase 2
Altamira Phase 2 is a new construction project at 15004 Avery Ranch Blvd B, Austin, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $900K across about 2,857 sq ft.
๐Project Metrics
TDLR #TABS2023009807Project Closed
Project has been completed and closed
Altamira Phase 2 is a New Construction project located at 15004 Avery Ranch Blvd B, Austin, TX 78717 in Austin, Texas. The project has an estimated value of $900K covering 2,857 sq ft. Dr Elizabeth Lowery is the property owner and SKB Architecture and Design is the design firm of record. The project was registered with TDLR on January 19, 2023.
โFrequently Asked Questions
What is Altamira Phase 2?
Altamira Phase 2 is a new construction project at 15004 Avery Ranch Blvd B in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Buildout of two story dental and office space
Is Altamira Phase 2 open in Austin?
Construction on Altamira Phase 2 is complete โ TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.
Where is Altamira Phase 2 located?
Altamira Phase 2 is located at 15004 Avery Ranch Blvd B, Austin, TX, 78717, in Williamson County.
Who is the owner or developer of Altamira Phase 2?
Dr Elizabeth Lowery is the property owner/developer of record for Altamira Phase 2, per its TDLR project registration.
Who is the architect or design firm for Altamira Phase 2?
SKB Architecture and Design is the design firm of record for Altamira Phase 2, according to its TDLR filing.
How much does Altamira Phase 2 cost and how big is it?
Altamira Phase 2 has an estimated construction value of $900K and approximately 2,857 square feet (about $315/sqft), based on its TDLR filing.
๐Scope of Work
Tenant Buildout of two story dental and office space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 19, 2023
Review Complete
Inspection Complete
Closed
May 31, 2024
๐Related Projects
๐๏ธSame Design Firm
$16.3M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater 40G Nat Gas Water Heater Replacement ***Austin ETJ***
Install new 24.3kW rooftop solar and energy storage system to new residential only.
Face-lit channel letters for Austin Elite Smiles #23-3479 - Sign B
Face-lit channel letters for Austin Elite Smiles #23-3479 Sign C
Tenant Build Out for Core and Shell
Property Owner
Design Firm
Williamson County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson