Dril-Quip
Dril-Quip is a renovation/alteration project at 2050 W Sam houston Parkway South Suite 1100, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2023). The project has an estimated value of $150K across about 16,579 sq ft.
๐Project Metrics
TDLR #TABS2023010049Project Closed
Project has been completed and closed
Dril-Quip is a Renovation/Alteration project located at 2050 W Sam houston Parkway South Suite 1100, Houston, TX 77042 in Houston, Texas. The project has an estimated value of $150K covering 16,579 sq ft. Two BriarLake Plaza, LP is the property owner and Inventure is the design firm of record. The project was registered with TDLR on January 23, 2023.
โFrequently Asked Questions
What is Dril-Quip?
Dril-Quip is a renovation/alteration project at 2050 W Sam houston Parkway South Suite 1100 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant renovation
Is Dril-Quip open in Houston?
Construction on Dril-Quip is complete โ TDLR records show the project passed its required accessibility inspection in May 2023. The building is finished and very likely open.
Where is Dril-Quip located?
Dril-Quip is located at 2050 W Sam houston Parkway South Suite 1100, Houston, TX, 77042, in Harris County.
Who is the owner or developer of Dril-Quip?
Two BriarLake Plaza, LP is the property owner/developer of record for Dril-Quip, per its TDLR project registration.
Who is the architect or design firm for Dril-Quip?
Inventure is the design firm of record for Dril-Quip, according to its TDLR filing.
How much does Dril-Quip cost and how big is it?
Dril-Quip has an estimated construction value of $150K and approximately 16,579 square feet (about $9/sqft), based on its TDLR filing.
๐Scope of Work
Interior tenant renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 23, 2023
Review Complete
Inspection Complete
Closed
May 1, 2023