The Burger Bar
The Burger Bar is a additions to existing building project at 7708 Lohman Ford Rd. E 202, Lago Vista, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $100K across about 2,380 sq ft.
๐Project Metrics
TDLR #TABS2023010263Review Complete
Design review complete, construction may proceed
The Burger Bar is a Additions to Existing Building project located at 7708 Lohman Ford Rd. E 202, Lago Vista, TX 78645 in Lago Vista, Texas. The project has an estimated value of $100K covering 2,380 sq ft. Centres Southwest is the property owner and Centres Southwest is the design firm of record. The project was registered with TDLR on January 25, 2023.
โFrequently Asked Questions
What is The Burger Bar?
The Burger Bar is a additions to existing building project at 7708 Lohman Ford Rd. E 202 in Lago Vista, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finishout
Is The Burger Bar open in Lago Vista?
The Burger Bar is currently under construction in Lago Vista, TX. Its current TDLR status is "Review Complete".
Where is The Burger Bar located?
The Burger Bar is located at 7708 Lohman Ford Rd. E 202, Lago Vista, TX, 78645, in Travis County.
Who is the owner or developer of The Burger Bar?
Centres Southwest is the property owner/developer of record for The Burger Bar, per its TDLR project registration.
Who is the architect or design firm for The Burger Bar?
Centres Southwest is the design firm of record for The Burger Bar, according to its TDLR filing.
How much does The Burger Bar cost and how big is it?
The Burger Bar has an estimated construction value of $100K and approximately 2,380 square feet (about $42/sqft), based on its TDLR filing.
๐Scope of Work
Interior Finishout
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 25, 2023
Review Complete
Jan 25, 2023
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Total demo of SFR 2230 sq ft circa 1978 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Replacement of complete existing central heat and air system with or without duct work Garage - attic stairs.
30 amp car charger and surge protector install as required
Install a new 60-amp 240 Volt circuit in the 150amp main panel. route the conductors from the main panel into the garage Across the garage ceiling through surface mounted conduit. hardwired GM power up on the left interior garage wall. the charger will be installed on a 60-amp circuit and will draw up to 48 amp continuous
Emergency gas leak line replacement on the Tx Gas side. AFS needs to relocate the house line to be in compliance with Texas Gas and the Rail Road commission.