22135 LKWP Irving TX Lot 2
22135 LKWP Irving TX Lot 2 is a new construction project at 4651 Northgate Drive, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $7.0M across about 100,500 sq ft.
๐Project Metrics
TDLR #TABS2023010681Project Closed
Project has been completed and closed
22135 LKWP Irving TX Lot 2 is a New Construction project located at 4651 Northgate Drive, Irving, TX 75038 in Irving, Texas. The project has an estimated value of $7.0M covering 100,500 sq ft. Lake Washington Partners is the property owner and ATA Beilharz Architects LLC is the design firm of record. The project was registered with TDLR on January 31, 2023.
โFrequently Asked Questions
What is 22135 LKWP Irving TX Lot 2?
22135 LKWP Irving TX Lot 2 is a new construction project at 4651 Northgate Drive in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction of storage facility
Is 22135 LKWP Irving TX Lot 2 open in Irving?
Construction on 22135 LKWP Irving TX Lot 2 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
Where is 22135 LKWP Irving TX Lot 2 located?
22135 LKWP Irving TX Lot 2 is located at 4651 Northgate Drive, Irving, TX, 75038, in Dallas County.
Who is the owner or developer of 22135 LKWP Irving TX Lot 2?
Lake Washington Partners is the property owner/developer of record for 22135 LKWP Irving TX Lot 2, per its TDLR project registration.
Who is the architect or design firm for 22135 LKWP Irving TX Lot 2?
ATA Beilharz Architects LLC is the design firm of record for 22135 LKWP Irving TX Lot 2, according to its TDLR filing.
How much does 22135 LKWP Irving TX Lot 2 cost and how big is it?
22135 LKWP Irving TX Lot 2 has an estimated construction value of $7.0M and approximately 100,500 square feet (about $70/sqft), based on its TDLR filing.
๐Scope of Work
New construction of storage facility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 31, 2023
Review Complete
Inspection Complete
Closed
Dec 1, 2023
๐Related Projects
๐คSame Owner
$7.6M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Dallas County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Dallas County
Find General Contractors in Dallas