Design review complete, construction may proceed
ABIA Existing Terminal Centralized Baggage Handling System Upgrades is a New Construction project located at 3600 Presidential Blvd., Austin, TX 78719 in Austin, Texas. The project has an estimated value of $881K covering 13,540 sq ft. City of Austin Department of Aviation is the property owner and Gensler is the design firm of record. The project was registered with TDLR on January 31, 2023.
reconfig Checkpoint 2W and 2E, expansion of the checked baggage system. Scope at 2W: screening lane, with equipment, reconfig system and 1 existing room into a private room. Scope 2E: reconfig of storefront system at existing egress.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jan 31, 2023
Review Complete
Jan 31, 2023
Inspection Complete
Closed
Building permits found at or near this location
Installation of Fireline + Riser
Secondary Contractor Underground Water/Wastewater & Storm Lines
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase II]
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase 1]
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase 1]
City of Austin site plan approvals at this location
Businesses at and near this location
Business data from Google
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis