๐Ÿ“Review Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

ABIA Existing Terminal Centralized Baggage Handling System Upgrades

3600 Presidential Blvd., Austin, TX 78719, Austin, TX, 78719
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2023010706
$881K
Project Value
13,540
Square Feet
$65/sqft
Cost/SqFt
4 months
Duration
Registered:Jan 31, 2023
Start:Mar 1, 2023
Target:Jun 30, 2023
๐Ÿ“

Review Complete

Design review complete, construction may proceed

๐Ÿ“‹Scope of Work

reconfig Checkpoint 2W and 2E, expansion of the checked baggage system. Scope at 2W: screening lane, with equipment, reconfig system and 1 existing room into a private room. Scope 2E: reconfig of storefront system at existing egress.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
January 31, 2023
Review Complete
January 31, 2023
Construction Start
March 1, 2023
Expected Completion
June 30, 2023

๐Ÿ“Location & Views

Open in MapsGet Directions|30.20953, -97.66966

๐Ÿ“„Related City Permits

Building permits found at or near this location

2921 1/2 PRESIDENTIAL BLVD
117 ft away

Installation of Fireline + Riser

ActivePlumbing PermitFirelineJul 2025
View Details
2025-089802 PP
๐Ÿ”งAustin Commercial LP
2921 1/2 PRESIDENTIAL BLVD
117 ft away

Secondary Contractor Underground Water/Wastewater & Storm Lines

ActivePlumbing PermitRepairJul 2025
View Details
2025-089800 PP
๐Ÿ”งAustin Commercial LP
2921 1/2 PRESIDENTIAL BLVD
117 ft away

Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase II]

ActiveElectrical PermitNewJul 2025
View Details
2025-056332 EP
๐Ÿ”งSchmidt Electric Co Inc
2921 1/2 PRESIDENTIAL BLVD
117 ft away

Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase 1]

ActiveElectrical PermitNewJul 2025
View Details
2025-056331 EP
๐Ÿ”งSchmidt Electric Co Inc
2921 1/2 PRESIDENTIAL BLVD
117 ft away

Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase II]

ActiveMechanical PermitNewJul 2025
View Details
2025-056332 MP
๐Ÿ”งMLN Company

๐Ÿ“Related Site Plans

City of Austin site plan approvals at this location

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists