Film Alley Schulman Theatres - Interior Kitchen & Bar Renovation
๐Project Metrics
TDLR #TABS2023012133Project Closed
Project has been completed and closed
๐Scope of Work
Select demolition of existing interior spaces and construction of kitchen, bar, lobby, and mini bowling spaces of an existing cinema building. Proposed work will not disturb existing main paths of egress.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Interior Non-Structural Demolition
Removing existing electrical panel and meter enclosure. Installing new 200amp main breaker panel. Installing an Austin Energy approved meter enclosure. Repairing the riser due to existing old cloth wire. New riser to be ridged conduit.
ev charger install
Express: Fire damage restoration like for like. Unit B only.
EMERGENCY - No Gas Gas pressure test