Industrious Austin 823 Congress 5th Floor Expansion
๐Project Metrics
TDLR #TABS2023014443Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
Interior alteration of a business office suite. Demolition includes removal of non-load bearing partitions, decorative finishes, and limited removal/relocation of light fixtures. New construction will include interior partitions, doors, low voltage
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Rebuild and update to current NEC. 150 Amp 120/240 V main electric service.
ePlan: Commerical Expedited Review- New Construction 4 story Multi Family Building. (92004 SF).
Access Control - installing electronic locks
Replace 3/4 backflow preventer for soda fountain machine located in back room above the mop sink second from the top.
Installation of 36 electrical vehicle chargers (EVSE) 2 x 500KVA transformers 2 x 1200A panelboards associated conduit and wire.