The Local Pint
The Local Pint is a renovation/alteration project at 2750 Churchill Dr Suite 170, Irving, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2023). The project has an estimated value of $244K across about 3,906 sq ft.
๐Project Metrics
TDLR #TABS2023014646Project Closed
Project has been completed and closed
The Local Pint is a Renovation/Alteration project located at 2750 Churchill Dr Suite 170, Irving, TX 75022 in Irving, Texas. The project has an estimated value of $244K covering 3,906 sq ft. Joseph & Mkariws, LLC is the property owner and WILLIAM PECK ASSOC INC is the design firm of record. The project was registered with TDLR on March 21, 2023.
โFrequently Asked Questions
What is The Local Pint?
The Local Pint is a renovation/alteration project at 2750 Churchill Dr Suite 170 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior finish-out
Is The Local Pint open in Irving?
Construction on The Local Pint is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2023. The building is finished and very likely open.
Where is The Local Pint located?
The Local Pint is located at 2750 Churchill Dr Suite 170, Irving, TX, 75022, in Denton County.
Who is the owner or developer of The Local Pint?
Joseph & Mkariws, LLC is the property owner/developer of record for The Local Pint, per its TDLR project registration.
Who is the architect or design firm for The Local Pint?
WILLIAM PECK ASSOC INC is the design firm of record for The Local Pint, according to its TDLR filing.
How much does The Local Pint cost and how big is it?
The Local Pint has an estimated construction value of $244K and approximately 3,906 square feet (about $62/sqft), based on its TDLR filing.
๐Scope of Work
interior finish-out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 21, 2023
Review Complete
Inspection Complete
Closed
Jul 28, 2023