Northtown Phase 2, 1A
Northtown Phase 2, 1A is a new construction project at 400 East Wells Branch Parkway, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $50.0M across about 411,627 sq ft.
๐Project Metrics
TDLR #TABS2023016423Review Complete
Design review complete, construction may proceed
Northtown Phase 2, 1A is a New Construction project located at 400 East Wells Branch Parkway, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $50.0M covering 411,627 sq ft. Mikael Levey is the property owner and Planworx Architecture is the design firm of record. The project was registered with TDLR on April 12, 2023.
โFrequently Asked Questions
What is Northtown Phase 2, 1A?
Northtown Phase 2, 1A is a new construction project at 400 East Wells Branch Parkway in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 14 3-story apartment buildings. Clubhouse, pool house, and ancillary amenity structures including mail kiosk, maintenance building and trash enclosure.
Is Northtown Phase 2, 1A open in Austin?
Northtown Phase 2, 1A is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Northtown Phase 2, 1A located?
Northtown Phase 2, 1A is located at 400 East Wells Branch Parkway, Austin, TX, 78702, in Travis County.
Who is the owner or developer of Northtown Phase 2, 1A?
Mikael Levey is the property owner/developer of record for Northtown Phase 2, 1A, per its TDLR project registration.
Who is the architect or design firm for Northtown Phase 2, 1A?
Planworx Architecture is the design firm of record for Northtown Phase 2, 1A, according to its TDLR filing.
How much does Northtown Phase 2, 1A cost and how big is it?
Northtown Phase 2, 1A has an estimated construction value of $50.0M and approximately 411,627 square feet (about $121/sqft), based on its TDLR filing.
๐Scope of Work
14 3-story apartment buildings. Clubhouse, pool house, and ancillary amenity structures including mail kiosk, maintenance building and trash enclosure.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 12, 2023
Review Complete
Apr 12, 2023
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$138.7M total๐๏ธSame Design Firm
$138.7M total๐Related City Permits
Building permits found at or near this location
Main breaker tripping for building need AE to provide emergency shutdown to investigate for connection issues and potential fault.
Installation of a 240 sf (8 ft x 30 ft) pre-fabricated aluminum covered walkway at the Eastside campus entrance to provide weather protection from the drop-off point to the building. Scope includes laying out and placing 6 concrete footings to support structural columns. All work to be completed per engineering specifications.
Installation of solar light poles around the existing playground area to increase security. 2026 015673 DA - Approved
Gas line to New Generator
Extend existing circuits from existing starline busway to 8) rows of benches in 5th floor lab. This scope of work was discussed and approved by Hyatt Dunn.
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Find Professionals