Final inspection completed, awaiting project closure
Uhland Fire Station 1109 is a New Construction project located at 120 Camino Real, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $600K covering 6,160 sq ft. Travis County Fire House ESD 11 is the property owner. The project was registered with TDLR on April 25, 2023.
new fire station
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 25, 2023
Review Complete
Inspection Complete
Oct 1, 2025
Closed
Building permits found at or near this location
Replacing failing copper piping with new pex. Pex will be ran from the water heater room with dedicated hot and cold supply for unit 207 Isolation val
Repair water pipes for unit 103. Replacing with new pex coming from water heater room. running 3/4 main water line to unit with hot and cold shut offs
Replacing failing copper piping with new pex. Pex will be ran from the water heater room with dedicated hot and cold supply for unit 105. Isolation va
Replacing failed copper piping for unit 104. Running new pex from water heater room. Lines will feed unit 104 only with hot and cold isolation valves
35 tunnel below the foundation to replace entire drain system. 1 access hole - back
Need a contractor for this project?
Browse verified general contractors active in Hays County
Find General Contractors in Hays