HMWH MOB3 PO PCG and SD Clinic Suite 403
HMWH MOB3 PO PCG and SD Clinic Suite 403 is a renovation/alteration project at 18700 Katy Freeway Suite 403, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2024). The project has an estimated value of $2.3M across about 22,559 sq ft.
๐Project Metrics
TDLR #TABS2023017536Project Closed
Project has been completed and closed
HMWH MOB3 PO PCG and SD Clinic Suite 403 is a Renovation/Alteration project located at 18700 Katy Freeway Suite 403, Houston, TX 77094 in Houston, Texas. The project has an estimated value of $2.3M covering 22,559 sq ft. Houston Methodist Medical Office Buildings is the property owner and Page Southerland Page, Inc. is the design firm of record. The project was registered with TDLR on April 26, 2023.
โFrequently Asked Questions
What is HMWH MOB3 PO PCG and SD Clinic Suite 403?
HMWH MOB3 PO PCG and SD Clinic Suite 403 is a renovation/alteration project at 18700 Katy Freeway Suite 403 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior renovation of a suite in an existing MOB
Is HMWH MOB3 PO PCG and SD Clinic Suite 403 open in Houston?
Construction on HMWH MOB3 PO PCG and SD Clinic Suite 403 is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2024. The building is finished and very likely open.
Where is HMWH MOB3 PO PCG and SD Clinic Suite 403 located?
HMWH MOB3 PO PCG and SD Clinic Suite 403 is located at 18700 Katy Freeway Suite 403, Houston, TX, 77094, in Harris County.
Who is the owner or developer of HMWH MOB3 PO PCG and SD Clinic Suite 403?
Houston Methodist Medical Office Buildings is the property owner/developer of record for HMWH MOB3 PO PCG and SD Clinic Suite 403, per its TDLR project registration.
Who is the architect or design firm for HMWH MOB3 PO PCG and SD Clinic Suite 403?
Page Southerland Page, Inc. is the design firm of record for HMWH MOB3 PO PCG and SD Clinic Suite 403, according to its TDLR filing.
How much does HMWH MOB3 PO PCG and SD Clinic Suite 403 cost and how big is it?
HMWH MOB3 PO PCG and SD Clinic Suite 403 has an estimated construction value of $2.3M and approximately 22,559 square feet (about $100/sqft), based on its TDLR filing.
๐Scope of Work
interior renovation of a suite in an existing MOB
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 26, 2023
Review Complete
Inspection Complete
Closed
Feb 7, 2024