Suite 720
Suite 720 is a renovation/alteration project at 811 Barton Springs Road Suite 720, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2023). The project has an estimated value of $275K across about 2,541 sq ft.
๐Project Metrics
TDLR #TABS2023017820Project Closed
Project has been completed and closed
Suite 720 is a Renovation/Alteration project located at 811 Barton Springs Road Suite 720, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $275K covering 2,541 sq ft. CPF 811 Barton is the property owner and Red Design Studios is the design firm of record. The project was registered with TDLR on April 28, 2023.
โFrequently Asked Questions
What is Suite 720?
Suite 720 is a renovation/alteration project at 811 Barton Springs Road Suite 720 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Combine two suites to finish out for a future tenant
Is Suite 720 open in Austin?
Construction on Suite 720 is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2023. The building is finished and very likely open.
Where is Suite 720 located?
Suite 720 is located at 811 Barton Springs Road Suite 720, Austin, TX, 78704, in Travis County.
Who is the owner or developer of Suite 720?
CPF 811 Barton is the property owner/developer of record for Suite 720, per its TDLR project registration.
Who is the architect or design firm for Suite 720?
Red Design Studios is the design firm of record for Suite 720, according to its TDLR filing.
How much does Suite 720 cost and how big is it?
Suite 720 has an estimated construction value of $275K and approximately 2,541 square feet (about $108/sqft), based on its TDLR filing.
๐Scope of Work
Combine two suites to finish out for a future tenant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 28, 2023
Review Complete
Inspection Complete
Closed
Nov 10, 2023
๐Related Projects
๐คSame Owner
$7.8M total๐๏ธSame Design Firm
$52.7M total๐Related City Permits
Building permits found at or near this location
Installing a new irrigation system
Installing a new irrigation system
Replacement of an existing water heater replacing gas tank water heater with similar model
White box tenant finish out with new restroom demise walls electrical hvac and plumbing.
Express: Replacing 8 windows