PNC Bank ADA Remediation Design - E400 Stassney is a renovation/alteration project at 1912 West Stassney Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2025). The project has an estimated value of $220K across about 4,300 sq ft.
Final inspection completed, awaiting project closure
PNC Bank ADA Remediation Design - E400 Stassney is a Renovation/Alteration project located at 1912 West Stassney Lane, Austin, TX 78745 in Austin, Texas. The project has an estimated value of $220K covering 4,300 sq ft. PNC Bank, N.A. is the property owner and Michael Baker International is the design firm of record. The project was registered with TDLR on May 8, 2023.
PNC Bank ADA Remediation Design - E400 Stassney is a renovation/alteration project at 1912 West Stassney Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The improvements intend to bring the facility exterior accessible parking/access aisle and accessible pedestrian paths into compliance with current ADA standards.
Construction on PNC Bank ADA Remediation Design - E400 Stassney is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2025. The building is finished and very likely open.
PNC Bank ADA Remediation Design - E400 Stassney is located at 1912 West Stassney Lane, Austin, TX, 78745, in Travis County.
PNC Bank, N.A. is the property owner/developer of record for PNC Bank ADA Remediation Design - E400 Stassney, per its TDLR project registration.
Michael Baker International is the design firm of record for PNC Bank ADA Remediation Design - E400 Stassney, according to its TDLR filing.
PNC Bank ADA Remediation Design - E400 Stassney has an estimated construction value of $220K and approximately 4,300 square feet (about $51/sqft), based on its TDLR filing.
The improvements intend to bring the facility exterior accessible parking/access aisle and accessible pedestrian paths into compliance with current ADA standards.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 8, 2023
Review Complete
Inspection Complete
Oct 31, 2025
Closed
Building permits found at or near this location
New Autofill Pool for 1912 S 3RD ST
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Two Stage Vertical Gas System
45 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - back back front
New Autofill Pool for 1912 S 3RD ST
Addition of a Manual Transfer Switch and a service disconnect to the building the MTS will be installed after the main service disconnect to provide capabilities to connect a TEMPORARY towable generator when needed during outages. The Manual Transfer Switch is equipped with an interlock mechanism that prevent utility and/or generator power to back feed each other.