Hotel Coronado
Hotel Coronado is a new construction project at 2307 Coronado St., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.0M across about 5,309 sq ft.
๐Project Metrics
TDLR #TABS2023018716Review Complete
Design review complete, construction may proceed
Hotel Coronado is a New Construction project located at 2307 Coronado St., Austin, TX 78702 in Austin, Texas. The project has an estimated value of $1.0M covering 5,309 sq ft. Coronado Partners LLC is the property owner and Reach Architects is the design firm of record. The project was registered with TDLR on May 9, 2023.
โFrequently Asked Questions
What is Hotel Coronado?
Hotel Coronado is a new construction project at 2307 Coronado St. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of new two unit hotel
Is Hotel Coronado open in Austin?
Hotel Coronado is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Hotel Coronado located?
Hotel Coronado is located at 2307 Coronado St., Austin, TX, 78702, in Travis County.
Who is the owner or developer of Hotel Coronado?
Coronado Partners LLC is the property owner/developer of record for Hotel Coronado, per its TDLR project registration.
Who is the architect or design firm for Hotel Coronado?
Reach Architects is the design firm of record for Hotel Coronado, according to its TDLR filing.
How much does Hotel Coronado cost and how big is it?
Hotel Coronado has an estimated construction value of $1.0M and approximately 5,309 square feet (about $188/sqft), based on its TDLR filing.
๐Scope of Work
Construction of new two unit hotel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 9, 2023
Review Complete
May 9, 2023
Inspection Complete
Closed
๐Related Projects
๐๏ธSame Design Firm
$6.1M total๐Related City Permits
Building permits found at or near this location
New three-story office building demolition of some sidewalks. driveway courtyard area where new building is to be constructed
i have to rewire the existing t pole because LINE SIDE WAS CONNECT ON LOAD SIDE SO
Express - Replacing inswing patio door with same size prehung sliding door
Tunnel under the foundation 10Ft to repair a damaged rubber boot located under the foundation.
Replacement of an existing water heater Replace 50-gallon electric water heater Located in garage
Property Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis