Campo at UFCU
Campo at UFCU is a renovation/alteration project at 8303 N. Mopac Expressway Building A, Suite A210, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $400K across about 4,890 sq ft.
๐Project Metrics
TDLR #TABS2023020857Project Closed
Project has been completed and closed
Campo at UFCU is a Renovation/Alteration project located at 8303 N. Mopac Expressway Building A, Suite A210, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $400K covering 4,890 sq ft. Aquila is the property owner. The project was registered with TDLR on June 7, 2023.
โFrequently Asked Questions
What is Campo at UFCU?
Campo at UFCU is a renovation/alteration project at 8303 N. Mopac Expressway Building A, Suite A210 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation consisting of separating one existing suite into two separate suites
Is Campo at UFCU open in Austin?
Construction on Campo at UFCU is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
Where is Campo at UFCU located?
Campo at UFCU is located at 8303 N. Mopac Expressway Building A, Suite A210, Austin, TX, 78759, in Travis County.
Who is the owner or developer of Campo at UFCU?
Aquila is the property owner/developer of record for Campo at UFCU, per its TDLR project registration.
How much does Campo at UFCU cost and how big is it?
Campo at UFCU has an estimated construction value of $400K and approximately 4,890 square feet (about $82/sqft), based on its TDLR filing.
๐Scope of Work
Interior renovation consisting of separating one existing suite into two separate suites
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 7, 2023
Review Complete
Inspection Complete
Closed
Dec 31, 2023
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Main panel change out
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacement of four (4) CHW air handling units (units #11 and #12 on the 2nd floor and #17 and #18 on the 3rd floor)
Replacement of complete existing central heat and air system with or without duct work
Express: partial reroof. Material change (asphalt shingles to metal) and 1850 sqft redeck Revision: Full re-roof instead of partial re-roof