HMSL MOB 4 PO RHEUMATOLOGY SUITE 300
HMSL MOB 4 PO RHEUMATOLOGY SUITE 300 is a renovation/alteration project at 16537 Southwest Freeway, Sugar Land, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2024). The project has an estimated value of $974K across about 7,789 sq ft.
๐Project Metrics
TDLR #TABS2023021342Project Closed
Project has been completed and closed
HMSL MOB 4 PO RHEUMATOLOGY SUITE 300 is a Renovation/Alteration project located at 16537 Southwest Freeway, Sugar Land, TX 77479 in Sugar Land, Texas. The project has an estimated value of $974K covering 7,789 sq ft. Houston Methodist Medical Office Buildings is the property owner and Page Southerland Page, Inc. is the design firm of record. The project was registered with TDLR on June 14, 2023.
โFrequently Asked Questions
What is HMSL MOB 4 PO RHEUMATOLOGY SUITE 300?
HMSL MOB 4 PO RHEUMATOLOGY SUITE 300 is a renovation/alteration project at 16537 Southwest Freeway in Sugar Land, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: buildout of existing suite in an MOB
Is HMSL MOB 4 PO RHEUMATOLOGY SUITE 300 open in Sugar Land?
Construction on HMSL MOB 4 PO RHEUMATOLOGY SUITE 300 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2024. The building is finished and very likely open.
Where is HMSL MOB 4 PO RHEUMATOLOGY SUITE 300 located?
HMSL MOB 4 PO RHEUMATOLOGY SUITE 300 is located at 16537 Southwest Freeway, Sugar Land, TX, 77479, in Fort Bend County.
Who is the owner or developer of HMSL MOB 4 PO RHEUMATOLOGY SUITE 300?
Houston Methodist Medical Office Buildings is the property owner/developer of record for HMSL MOB 4 PO RHEUMATOLOGY SUITE 300, per its TDLR project registration.
Who is the architect or design firm for HMSL MOB 4 PO RHEUMATOLOGY SUITE 300?
Page Southerland Page, Inc. is the design firm of record for HMSL MOB 4 PO RHEUMATOLOGY SUITE 300, according to its TDLR filing.
How much does HMSL MOB 4 PO RHEUMATOLOGY SUITE 300 cost and how big is it?
HMSL MOB 4 PO RHEUMATOLOGY SUITE 300 has an estimated construction value of $974K and approximately 7,789 square feet (about $125/sqft), based on its TDLR filing.
๐Scope of Work
buildout of existing suite in an MOB
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 14, 2023
Review Complete
Inspection Complete
Closed
Jan 2, 2024