ACC HLC2 2.1409 Shell Space Finish Out
ACC HLC2 2.1409 Shell Space Finish Out is a renovation/alteration project at 6101 Highland Campus Dr., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $300K across about 1,500 sq ft.
๐Project Metrics
TDLR #TABS2023021839Project Closed
Project has been completed and closed
ACC HLC2 2.1409 Shell Space Finish Out is a Renovation/Alteration project located at 6101 Highland Campus Dr., Austin, TX 78752 in Austin, Texas. The project has an estimated value of $300K covering 1,500 sq ft. Austin Community College is the property owner. The project was registered with TDLR on June 20, 2023.
โFrequently Asked Questions
What is ACC HLC2 2.1409 Shell Space Finish Out?
ACC HLC2 2.1409 Shell Space Finish Out is a renovation/alteration project at 6101 Highland Campus Dr. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out, including mechanical, electrical, fire protection, AV and IT scopes.
Is ACC HLC2 2.1409 Shell Space Finish Out open in Austin?
Construction on ACC HLC2 2.1409 Shell Space Finish Out is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
Where is ACC HLC2 2.1409 Shell Space Finish Out located?
ACC HLC2 2.1409 Shell Space Finish Out is located at 6101 Highland Campus Dr., Austin, TX, 78752, in Travis County.
Who is the owner or developer of ACC HLC2 2.1409 Shell Space Finish Out?
Austin Community College is the property owner/developer of record for ACC HLC2 2.1409 Shell Space Finish Out, per its TDLR project registration.
How much does ACC HLC2 2.1409 Shell Space Finish Out cost and how big is it?
ACC HLC2 2.1409 Shell Space Finish Out has an estimated construction value of $300K and approximately 1,500 square feet (about $200/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out, including mechanical, electrical, fire protection, AV and IT scopes.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 20, 2023
Review Complete
Inspection Complete
Closed
Dec 29, 2023
๐Related Projects
๐Related City Permits
Building permits found at or near this location
15.8 KW solar system
QT - Install shade structures at existing school - OVA
Replacement of complete existing central heat and air system with or without duct work
Tunneling under home to replace cast iron sanitary piping for kitchen and bathrooms as well as replace or repairing copper water lines as needed. **We will be tunneling approximately 810 feet beneath the home with access located in the living room adjacent to the first-floor bathroom. The existing cast iron sanitary system will be replaced with approximately 200 feet of PVC piping. In addition the existing copper water distribution system will be abandoned and replaced with PEX piping
Replace 200amp panels replacing both meters junction gutter box grounding system and surge protection for both unit A and B Electric Provider - Austin Electric