Mata's Mexican Restaurant
Mata's Mexican Restaurant is a renovation/alteration project at 1305 S Old Bastrop Hwy, #101, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $150K across about 1,490 sq ft.
๐Project Metrics
TDLR #TABS2023022078Project Registered
Project has been registered with TDLR and is in pre-construction phase
Mata's Mexican Restaurant is a Renovation/Alteration project located at 1305 S Old Bastrop Hwy, #101, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $150K covering 1,490 sq ft. Jose Mata is the property owner and ZDA Architecture is the design firm of record. The project was registered with TDLR on June 23, 2023.
โFrequently Asked Questions
What is Mata's Mexican Restaurant?
Mata's Mexican Restaurant is a renovation/alteration project at 1305 S Old Bastrop Hwy, #101 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finish Out for New Restaurant
Is Mata's Mexican Restaurant open in San Marcos?
Mata's Mexican Restaurant is currently under construction in San Marcos, TX. Its current TDLR status is "Project Registered".
Where is Mata's Mexican Restaurant located?
Mata's Mexican Restaurant is located at 1305 S Old Bastrop Hwy, #101, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of Mata's Mexican Restaurant?
Jose Mata is the property owner/developer of record for Mata's Mexican Restaurant, per its TDLR project registration.
Who is the architect or design firm for Mata's Mexican Restaurant?
ZDA Architecture is the design firm of record for Mata's Mexican Restaurant, according to its TDLR filing.
How much does Mata's Mexican Restaurant cost and how big is it?
Mata's Mexican Restaurant has an estimated construction value of $150K and approximately 1,490 square feet (about $101/sqft), based on its TDLR filing.
๐Scope of Work
Interior Finish Out for New Restaurant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 23, 2023
Review Complete
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Rivian Wall EV Charger: Install a new 60-amp circuit in the 200-amp subpanel and route wiring right of the panel to the interior side wall of the garage To the interior right ball of the garage. hardwire the Rivian wall charger and configure to draw up to 48 amps continuous route wire behind the wall per customer instruction-- however if you notice obstructions CAT inhibit this wire like other wire plumbing wall joist please stop what you are doing and alert Tree House. A preference of the customer but we will not sacrifice damaging existing infrastructure for this.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacing inside air handler unit and outside condenser unit. Leaving all ductwork in tact.
Tunnel under foundation to replace cast iron with SCH 40 PVC for 2 full bathrooms kitchen and washer drain line with 2 access holes one located in the front left side of the home the second will be made in the right side by the garage area. Total length of tunnel is approximately 65 feet. We will replace sewer line from the home to the city tap connection which is about 50 feet in the yard. We will also replace water line from the meter to the home and repipe water lines inside the home for 2 full batrhooms kitchen and washer box and to the water heater.
Meter and panel change out grounding gas meter Installing 2 ground rods and grounding the panel