Waller Creek Tunnel Project - Waller Beach Improvements, SPR#2
📊Project Metrics
TDLR #TABS2023023098Project Closed
Project has been completed and closed
📋Scope of Work
Demolition of existing bulkhead dock, reconfiguration of docks to be all floating and restoration of riparian zone. Provision of ADA-compliant kayak slip and hoist; configuration of bulkheads, ramps and docks to be ADA-compliant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
Commercial Reroof
excavate an access hole in the front yard by the front door and tunnel 8¿ in an angle towards the sink to expose broken fitting
add new balcony unpermitted screen porch to be demolished
Replacement of complete existing central heat and air system with or without duct work
Replacing plugs in the kitchen & replacing existing lights to LED everything stays in same spot: like for like