7-Eleven #40869 Gasoline Maintenance is a renovation/alteration project at 4754 South Padre Island Drive, Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $175K across about 540 sq ft.
Project has been completed and closed
7-Eleven #40869 Gasoline Maintenance is a Renovation/Alteration project located at 4754 South Padre Island Drive, Corpus Christi, TX 78411 in Corpus Christi, Texas. The project has an estimated value of $175K covering 540 sq ft. Susser Holding II LP is the property owner and Core States Group is the design firm of record. The project was registered with TDLR on July 14, 2023.
7-Eleven #40869 Gasoline Maintenance is a renovation/alteration project at 4754 South Padre Island Drive in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Converting existing split 20K tank - 14K Diesel/6K Diesel to 14K Diesel/6K Premium
Construction on 7-Eleven #40869 Gasoline Maintenance is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
7-Eleven #40869 Gasoline Maintenance is located at 4754 South Padre Island Drive, Corpus Christi, TX, 78411, in Nueces County.
Susser Holding II LP is the property owner/developer of record for 7-Eleven #40869 Gasoline Maintenance, per its TDLR project registration.
Core States Group is the design firm of record for 7-Eleven #40869 Gasoline Maintenance, according to its TDLR filing.
7-Eleven #40869 Gasoline Maintenance has an estimated construction value of $175K and approximately 540 square feet (about $324/sqft), based on its TDLR filing.
Converting existing split 20K tank - 14K Diesel/6K Diesel to 14K Diesel/6K Premium
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 14, 2023
Review Complete
Inspection Complete
Closed
Dec 1, 2023