Sephora West Lake Hills
๐Project Metrics
TDLR #TABS2023023853Project Closed
Project has been completed and closed
๐Scope of Work
THIS PROJECT IS AN INTERIOR TENANT FIT-OUT FOR SEPHORA OF APPROXIMATELY 4,739 SF. WORK INCLUDES BUT IS NOT LIMITED TO, CONSTRUCTION OF STOREFRONTS,AWNING FABRIC, INTERIOR WALLS / PARTITIONS, WALL FIXTURES, FLOORING, CEILING, LIGHT FIXTURES...
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$3.6M total๐Related City Permits
Building permits found at or near this location
temporary tpole for new construction in Easton Park Ref 2025-119743 BP
Main panel replacement (without meters can) Replacing old main panel without a main breaker for a new one with a main breaker. No service upgrade no meter can replacement.
Construct a new walkway connecting from sidewalk to residence of 5 FT. SP-2024-0344C 2025 092714 000 00 SSI
Stationary Gantry Crane Installation in an Existing Lab Space
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 TON 2 STAGE HORIZONTAL GAS SYSTEM