Stoic Jiu Jitsu
📊Project Metrics
TDLR #TABS2023024114Project Closed
Project has been completed and closed
📋Scope of Work
tenant finish out in existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
Interior remodeling move electrical frame non-structural walls drywall paint flooring trim remodel of existing bathroom (replace fixtures)
Disconnect/Reconnect request for replacing 200 amp meter can and upgrading 200 amp main service panel.
Replacement of complete existing central heat and air system with or without duct work Replacement of complete existing central heat and air system with or without duct work Install 2 ton American Standard Seer 2 rated 17 seer split system and 2 stage gas furnace.
Install new 13.2 kW roof-top solar and 13.5 kWh energy storage system to the existing residential only.
Replacement of an existing water heater Standard 50 Gal Natural Gas water heater change out 3911 Walnut Clay Drive Austin TX 78731