TESLA is a renovation/alteration project at 11601 CENTURY OAKS TERRANCE ST #STE. 123, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2024). The project has an estimated value of $400K across about 5,080 sq ft.
๐Project Metrics
TDLR #TABS2023024526Project Closed
Project has been completed and closed
TESLA is a Renovation/Alteration project located at 11601 CENTURY OAKS TERRANCE ST #STE. 123, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $400K covering 5,080 sq ft. RICHARD E WESSELLS is the property owner and ARCADIS INC is the design firm of record. The project was registered with TDLR on July 26, 2023.
โFrequently Asked Questions
What is TESLA?
TESLA is a renovation/alteration project at 11601 CENTURY OAKS TERRANCE ST #STE. 123 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR REMODEL
Is TESLA open in Austin?
Construction on TESLA is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2024. The building is finished and very likely open.
Where is TESLA located?
TESLA is located at 11601 CENTURY OAKS TERRANCE ST #STE. 123, Austin, TX, 78758, in Travis County.
Who is the owner or developer of TESLA?
RICHARD E WESSELLS is the property owner/developer of record for TESLA, per its TDLR project registration.
Who is the architect or design firm for TESLA?
ARCADIS INC is the design firm of record for TESLA, according to its TDLR filing.
How much does TESLA cost and how big is it?
TESLA has an estimated construction value of $400K and approximately 5,080 square feet (about $79/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR REMODEL
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 26, 2023
Review Complete
Inspection Complete
Closed
Jan 8, 2024
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Need Permit for ETJ upgrading to 225 AMP service.
Modification of an existing conference room for a new conference room and equipment replacement. Existing office.
Express- Existing foundation repair as per scope of work attached
Addition and remodel The project includes an addition of 643 square feet on the second floor. Work will involve modifying an existing first-floor closet to construct a new stairway. The new second-floor addition will include one bedroom a living area a washer/dryer (W/D) area and a balcony.
Modification of an existing conference room for a new conference room and equipment replacement. Existing office.